Page Index

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42


PAGE TWENTY-THREE 1177TH HISTORY

         

              - CEMETERY MAINTENANCE BY 1393RD ECB

         

              THE FOLLOWING PROJECTS WERE COMPLETED:

         

          2ND - SURVEY HARBOR CRAFT COMPANY AREA



          3RD - THE 1000" RANGE      

                  

          5TH - MAP OF KUKUM AREA

         

              - BASKETBALL COURT AND BLEACHERS AT SERVICE CLUB



          7TH - SIGNAL DEPOT COVERED OECKS

         

              - KUKUM WATER SUPPLY EXTENSION

         

          8TH - SIGNAL DEPOT TELEPHONE EXCHANGE

         

              - CLEARING AREA FOR RECLAMATION CONTROL POINT

         

              - FIRE LANES AND CULVERTS, KUKUM BEACH AREA LEVELING

         

          9TH - ALTERATIONS AND ADDITIONS TO PX BUILDINGS AND SPECIAL

                 SERVICE AREA

         

         10TH - LUNGA CASUAL CAMP



         12TH - A.E.S. RADIO MASTS



         13TH - SHELTERS ENGINEER DEPOT



              - ROAD TO 353RD ORDNANCE BIVOUAC AREA



              - LEVELING KUKUM BEACH AREA



         14TH - HARBOR CRAFT COMPANY ROAD



              = RED CROSS DONUT FACTORY



              - RECONSTRUCTION OF HIGHWAY #50

         

         15TH - REMOVAL OF FALSE BENTS, DRIVING AND STRENGTHENING

                 DOLPHINS UPPER LUNGA RIVER BRIDGE

         

         16TH - ERECTION OF WATER STORAGE TANKS AT WATER POINT #21

         

         17TH - OUARTERS FOR FEMALE RED CROSS PERSONNEL

         

         19TH - IMPROVEMENT TO A.T.C. CAMP

         

         20TH - KUKUM BEACH PORT OFFICE

         

              - LUNGA BEACH DRAINAGE, ARMY AREA