Addendum
369th Engineer Regiment (SS)
Roster of Officers Assigned and Attached
At the Date of Reorganization
30 April 1944

Colonels

Pease, J. N.

Majors

Gibson, W. B.
McDaniel, E. E.

Captains

Angus, W. N.
Cadigan, F. M.
Cazes, L. O.
Durham, P. T.
Gast, R. R.
Jungclaus, W. H.
Kelly, J. F.
O'Brien, J. P.
Schleinitz, F. B.
Waterman, D. W.
Wolfe, J. R.
Wyman, R. E.

First Lieutenants

Bellagamba, G. A.
Collis, L. N.
Cox, W. B.
Goode, V. D.
Haiman, B. A.
House, R. M.
Jenkins, L. B.
Krupiak, M.
Latson, T. J.
McGee, W. B.
Miller, L. O.

First Lieutenants

Nix, L. W.
Prohaska, R. A.
Richford, J. E.
Rosenson, L. A.
Rowland, J. E.
Roycraft, J. T.
Stanowicz, S. J.
Wing, J. B.

Second Lieutenants

Baumberger, T. E.
Chatham, G. T.
Cook, B. E.
Davies, J. D.
Farrell, J. J.
Faulk, E. F.
Freeman, T. H.
Huensch, P. R.
Kelts, D. R.
Killough, W. J.
Kuras, T. R.
Phillips, A. T.
Rogosa, I. J.
Schilling, R. E.
Sousek, M. R.
Sturges, E. F.
Suiter, J. L.
Traylor, W. B.
Ulmer, D. H.


Warrant Officers

Arnot, C. D.
Klappsa, J. J.

Addendum
369th Engineer Regiment (SS)
Erstwhile Officers Assigned and Attached
20 December 1942 thru 29 April 1944

Colonels

Paules, E. G.

Lieutenant Colonels

Shane, H. K.
Womble, W. E.

Majors

Canavan, D. P.
Collins, R. S.
Koons, H. F.
Minnear, P.
Nichols, G. C.
Parker, I. H.
Richardson, E. M.
Singleton, J.
Tabor, C. E.

Captains

Asperger, H. A.
Beebe, F. T.
Binkele, E. C.
Buch, J. E.
Casey, D. E.
Cronin, W. F.
Dair, J. H.
Dunwiddie, B. R.
Durway, C. T.
Gribble, W. J.
Hill, G. F.
Metcalf, R. A.
Meyer, M. G.
Muskatt, H.
Neal, L. G.
Peterson, A. E.
Rosenblatt, I
Rubey, J. R.
Sheehy, J. F.
Sherbaum, W. R.
Sullivan, J. J.
Yeo, N. A.

First Lieutenants

Ackerman, R. W.
Adams, J. W.
Baszner, K. W.
Beer, O. N.
Brock, H. P.
Brugger, R. L.
Carey, W. M.
Cohen, J. S.
D’Amore, J. E.
Fetherson, E. A.
Galloway, B. E.
Gailey, D. R.
Hargrave, G. M.
Hyland, F. T.
Leavitt, H. S.
Lemire, A. G.
Pfisterer, H. A.
Phillips, W. D.
Wallis, W. R.
Watson, L. R.
Whiteside, G. C.
Zimet, S.

Second Lieutenants

Arnold, H.
Benson, A. J.
Black, W. E.
Eisenberg, D.
Ellison, J. E.
Etherton, W. W.
Gleeson, O. H.
Hicks, W. B.
Howard, R. F.
Kaczmarek, F. T.
Konecky, G. M.
Mayer, G.
Mayo, L. L.
Mills, J. B.
Robertson, C. A.
Rother, L. O.
Teaver, B. H.
Veschio, L. T.

Warrant Officers

Elton, C. F.

Addendum
The 369th Engineer Regiment (SS)
Consoliated List of Work Projects
California-Arizona Maneuver Area
8 May 1943 to 29 November 1943

Buildings

Base General Depot, California

5 warehouses
Complete buildings - 24 company area - 95%
Complete buildings - Devil Canyon Road area - 85%
Complete interior carpentry 13th Field Hospital
3 bath house - 13th Field Hospital area
Internal alterations Signal Building
3 warehouses 60' x 160', 47% completed by 369th
5 warehouses 60' x 160', 40% completed by 369th
AGD warehouse - U shaped bldgs erected from 3 - 20' x 64' bldgs
Dental clinic and lab buildings
Engineer supply office, 20' x 64'
Dispensary building, 20' x 64'
14 - 20' x 64' buildings removed
Addition to AGD warehouse 2 - 20' x 64' buildings
QM supply office, re-erected from 6 - 20' x 64' buildings
3 roof shelters between warehouses
Repair buildings 220th Station Hospital (storm damage)

Glamis, California

1 - 12 hole latrine

Bouse, California

1 - 12 hole latrine

Pomona, California

Bath house and latrine, Pomona Ordnance Base

Camps

Camp Granite, California

10 showers; 3 miles waterline; 5 miles repaired waterline; 50,000 gallon water tower/tank

Camp Horn, California

160 double tent frame kitchens; 190 latrines; 35 showers; 50 miles gravel road; 8 mile water line

Camp Ryder, California

15 mess halls; 15 kitchens; 15 latrines; 1,500' gravel roads

Bouse, Arizona

70 latrines; 45 kitchens & mess shelters; 3 mess halls; 9 dispensaries; 1 PX; 3 group headquarters; 1 theatre; 1 maintenance shop; 1 repair shop; 1 school building; 2 wards; 1 clinic and surgery; 1 stockade; 1 50,000 gallon reservoir; 1 septic tank; 9 battalion supply; 1 540' well; 2 fire hydrants; 1 25,000 gallon water tank; 4.1 miles pole line; 6 miles of roads; 900' sewer line; water lines - 6450' 10", 6600' 8", 1750' 6", 350' 4", 4500' 2"

Banning, California

57th Medical Battalion campsite; 300' 1-1/2" waterline; 16 head shower; 7 latrines; 1 mile gravel road

Muscoy, California

Replacement Depot; 13 mess shelters; 20 latrines; 5 showers

San Bernardino, California

Communication Zone Camp Headquarters and camp; 1 officers mess and club; 1 det PX; 1 det rec room; 3 det mess and kitchens; 1 MRU building; three signal, medical and school buildings; 7 latrines; 2 showers; 1 officers latrine and shower; officers tent frames and floors; 200 enlisted men tent floors; water pipe - 200' 1-1/2", 1700' 2", 1380' 4"

Indio, California

MP Battalion Camp Site: 1 re-erected latrine; 54 tent floors; 600' water line; 400' sewer line; wiring to all buildings and tents

Replacement Depot: 1 mess hall re-erected; 1 bath house re-erected; 20 position wash stand; 1 water storage tank; 500' water lines

Hospitals

Base General Depot, California

One station hospital: 7 wards; 7 barracks; 2 mess halls; 2 rec halls; 2 store houses; 3 bath houses; 1 fire house; 1 clinic and surgical' 1 lab and infirmary; 1 boiler house; 1 administration building; 1 bath and disinf; 1 morgue; (Completed: utilities, carpentry, flooring, exterior wall covering and painting.)

Landscaping, site grading, ½ outside wiring. Installed 5 fire hydrants; 7 miles gravel road.

Spadra, California

Spadra General Hospital: 9 wards.

Pomona, California

Pomona Station Hospital: 2 store houses; 4 barracks; 1 morgue; 1 PX; 1 bath house; 1 guard house; 9 wards; 3 mess halls; 2 rec halls; 3 nurses and officers quarters; 1 bath and disinf; 1 heater room; 1 clinic and surgical; 1 administration bldg; infirmary; 1 fire station; water lines: 280' - 1", 2490' - 2", 1583' - 4", 1539' - 6"; sewer lines: 2703' - 4"; 693' - 6"; 2715' - 8"; 3 miles 4" gravel roads.

Banning, California

Banning General Hospital: 34 wards; 6 store houses; 4 officers quarters; 6 nurses quarters; 13 det barracks; 1 clinic and surg; 1 administration building; 1 lab; 1 rec and evac; 1 infirmary; 1 bath and disinf; 3 mess halls; 4 rec halls; 1 PX; 1 morgue; 1 guard house; 1 fire station; 1 shop; 1 laundry; 7 baths and latrines; 1 - 12,000 gallon water tower reservoir; 1 pump house; water pipes: 2545' - ¾"; 3685' - 1", 1529' - 2"; 5450' - 4"; 8465 - 6"; 625' - 8"; Sewer pipe: 8705' -6"; 5525' - 8"; 1710' 10"; 6.85 miles roads.

Beaumont, California

Cherry Valley 1000 bed hospital supervised by 369th.

Banning, California

Convalescent Hospital: 6 latrines; 3 kitchens; 1 battalion shower; 3 3,000 gallon water tanks; roads.

Railroad Sidings

Yuma, AZ 2 RR Sidings - 2570'

B.G.D., CA Spur to gasoline tanks

B.G.D., CA South track open storage and wye

Glamis, CA 1000' spur and access road

Ogilby, CA 200' track removed

Camp Hyder, AZ 750' track, 300' dock built

Camp Hyder, AZ 3400' track, recon & location

Yuma, AZ Recon & location 2 spurs 4800; & 3500'

Yuma, AZ8750' track, 7.5 miles gravel road

Glamis, CA 1000' track removed

Ogilby, CA 850' track removed

Rifle Ranges

B.G.D., CA Construction Cable Canyon rifle range; 48 target Transition range and infiltration course

Needles, CA Survey and recon 48 pt Class A range

Yuma, AZ Survey and recon 48 pt Class A range

Roads

Camp Hyder, AZ 1500' gravel road, Camp Hyder Extension

Glamis-Nyland 32 miles road graded

Danby, CA 2 miles road graded

B.G.D., CA ¼ mile entrance road built

B.G.D., CA 220th Station Hospital roads oiled

Indio, CA 4700 sq yd loading area graveled 6"

Pomona, CA ½ mile Pomona Country Club Road graded

Miscellaneous

Hyder, AZ 2 10,000 gal water storage tanks erected

Camp Young, AZ Hospital laundry equipment installed

B.G.D., CA Completion of stockade, 1 shower, 1 latrine, 1 mess hall & kitchen, adm bldg & latrine

B.G.D., CA 400' 2" water line, 13th Field Hospital

Hyder, AZChlorinator installed

B.G.D., CA 2 auto wash racks built

B.G.D., CA QM Service Battalion area work completed

Camp Horn, AZ 4 sprinkler tanks built

B.G.D., CA Erected 2 10,000 gallon, 1 5,000 gallon gasoline storage tanks and 6 pumps

Yuma, AZ Water point constructed

Quartsite, AZ Demolition for pole lines

Camp Young, CA Laundry plumbing & equipment installation completed

Indio, CA 300' loading dock plus 5 ramps

Banning, CA Construct fire truck for Banning General Hospital

Laguna, AZ Remove earth dam

Bouse, AZ Construct 35-ton portable ramp

Bouse, AZ Gasoline engine and pump installed at well; 1 12-hole Latrine; road graveled/drainage

Spadra, CA Arm and leg bath installed Spadra General Hospital

Yuma, AZ Well pumps removed Yuma General Hospital

Spadra, CA Ditching surface water drainage Spadra General Hospital

Banning, CA Preparation of water connections, etc., for hospital train

Banning, CA Various installations M.W.D. east portal camp

Palm Springs, CA 2 12-hole latrines; 2 wash racks built

Yuma/Needles Equipment removed from Yuma and Needles hospitals to Banning General Hospital

Banning, CA Repair of M.W.D. buildings (formerly Communication Zone Headquarters)

Banning, CA Cleanup of former Communication Zone Detachment campsite